fix(pps): align firmware TOW with current RTL
This commit is contained in:
@@ -7,7 +7,7 @@ This report is generated by `stability_analysis.py`. The absolute LNAV epoch pat
|
||||
- Current RTL delivered the validated subframe after 9 following bits.
|
||||
- With 180 ms postponement, reference error was -0.000032 ms.
|
||||
- DUT minus trusted PPS was 32.01 ns. That remainder is the model's configured four-PCLK capture pipeline, not a measured board delay.
|
||||
- The production source still defines `POSTPONE_TOW` as 160 ms; this analysis uses the requested 180 ms candidate configuration.
|
||||
- Production firmware and this analysis both define `POSTPONE_TOW` as 180 ms for the current RTL delivery semantics.
|
||||
|
||||
## Repository hardware data
|
||||
|
||||
|
||||
Reference in New Issue
Block a user