10 KiB
GPS PPS end-to-end Linux validation
This package is a deterministic, causal validation of the project timing path
from synthetic GPS LNAV data to the physical PPS edge. It exists separately
from pps_python, whose models concentrate on WLS noise, oscillator behavior,
and adaptive-loop performance.
The validation does not use Linux wall-clock scheduling. The 1 kHz, 50 bit/s, RF-sample, PCLK, and 125 MHz events advance from synthetic timestamps, making the signed absolute-time result repeatable on a normal Linux host.
What is modeled
The model follows the current firmware and RTL conventions:
- It generates deterministic GPS LNAV subframes with D29*/D30* data inversion and valid parity for all ten 30-bit words.
- Each navigation bit is expanded to twenty 1 kHz prompt-sign samples.
- The
bit_gen.sv40 ms1 -> 0transition acquisition, majority decision, 20 msbit_validcadence, and registered ABS_SAMPLE behavior are applied. - The tracking wrapper's chronological
2 + 300 + 8 = 310bit window, preamble search, parity check,load_sigs, and subframe interrupt ordering are applied. nav_solve_timeris initialized from HOW Z-count and counts later bit-valid events. Navigation-solve interrupt, PPS counter capture, capture sequence, and a 32-bit RF ABS_SAMPLE wrap are exercised.- Firmware reconstructs periodic TOW from the HOW/sample anchor and evaluates
TOW + POSTPONE_TOW + STARTOFFSET - b/c. - The timestamped 125 MHz PPS peripheral performs coarse/normal mapping, ignores synthetic CPU/APB delay as phase, acquires lock after five valid updates, and generates integer-second edges.
- DUT edges are compared with an independent trusted PPS. Optional DUT and trusted-output delays make board, cable, and vendor delay sign explicit.
This is a digital epoch-path validation, not an RF waveform simulator. The
existing pps_python tests continue to cover WLS, oscillator, PI, adaptive
quality, and holdover behavior.
Run
From soc/software:
python3 -m pps_end_to_end_validation.pps_end_to_end
python3 -m unittest pps_end_to_end_validation/test_pps_end_to_end.py
The default command executes the diagnostic matrix:
scenario bits correction reference error DUT - trusted PPS
current-rtl/180ms 9 180 ms -0.000032 ms +0.000032 ms
current-rtl/160ms 9 160 ms -20.000032 ms +20.000032 ms
current-bit/160ms 8 160 ms -0.000032 ms +0.000032 ms
Positive DUT - trusted PPS means the project output is late. The default
32 ns remainder is the explicitly configured four-tick PCLK capture pipeline;
it is not part of the LNAV-bit mismatch.
Run one scenario or obtain machine-readable output:
python3 -m pps_end_to_end_validation.pps_end_to_end \
--mode current-rtl --postpone-ms 160 --json
python3 -m pps_end_to_end_validation.pps_end_to_end \
--mode current-bit \
--dut-output-delay-ns 12 \
--trusted-output-delay-ns 35
Closed-loop stability and dynamic tuning
The bit-level command above isolates the absolute epoch convention. The
companion stability analysis connects that result to the fixed-point
firmware/RTL PI model, replays the real GDOP and tracked-satellite history in
fusion/logs/gps_live_5min_20260713.csv, and synthesizes only the telemetry
that the repository did not capture:
python3 -m pps_end_to_end_validation.stability_analysis
python3 -m unittest \
pps_end_to_end_validation/test_stability_analysis.py
Generated results are in output/stability/:
stability_report.md: real-data inventory, discrete poles, absolute phase wander, period jitter, dynamic parameter sweep, and recommendations;parameter_sweep.csv: machine-readable results for every scenario/tuning;synthetic_telemetry.csv: 5 Hz ABS_SAMPLE, REM_CODE_PHASE, corrected 125 MHz capture, HDOP/VDOP/TDOP/GDOP, C/N0, pseudorange noise, clock sigma/drift, oscillator and timing-error inputs.
The older fusion capture used by stability_analysis.py contains 989 GDOP
values and 990 tracked-satellite values (eight throughout), but no PPS
phase/rate, ABS_SAMPLE, C/N0, TDOP/HDOP, pseudorange residual, oscillator
temperature, or trusted-edge/TIC samples. The newer live-board workflow below
supplies many of those PPS status fields, while ABS_SAMPLE, REM_CODE_PHASE,
temperature, and trusted-edge timing remain unavailable. The stability CSV
labels replacements as synthetic; it must not be read as board telemetry.
The current acquire, precision, and robust fixed-point poles are inside the unit circle at the 200 ms update rate, and the stress analysis observes no unlock. It also exposes an important metrics issue: cycle-to-cycle PPS period jitter can remain below 20 ns while absolute phase moves slowly through tens of nanoseconds. A physical 20 ns maximum therefore requires a common-clock time-interval-counter capture and cable/output-delay calibration; a p95 period jitter assertion or synthetic run cannot certify it.
The sweep includes the current coefficients, quieter/faster precision loops, a robust-noise guard, a larger Doppler-drift gain, and a quality-scheduled candidate. The generated report contains the current numerical comparison. The stability analysis does not alter loop constants. Production firmware now uses the current-RTL-compatible 180 ms epoch correction described below.
Live board telemetry replay
hardware_replay.py accepts the host-timestamped UART CSV produced by the
fusion capture utility. It extracts the firmware fields that actually drive
or describe PPS: raw/filtered WLS clock bias, innovation, Doppler datum drift,
TDOP/GDOP/HDOP/VDOP, clock sigma, C/N0, tracked/used satellites, velocity/FDE,
reference SVID, fractional capture correction, RTL phase residual, rate word,
integrator, lock/profile, pulse count, and commit sequence.
Capture and replay from soc/software:
python3 fusion/serial_capture.py \
--port /dev/ttyUSB2 --baud 460800 --duration 300 \
--output /tmp/genesys2_pps.csv
python3 -m pps_end_to_end_validation.hardware_replay \
--input /tmp/genesys2_pps.csv \
--output-dir pps_end_to_end_validation/output/hardware_replay
python3 -m unittest \
pps_end_to_end_validation.test_hardware_replay
Raw UART files are ignored by Git because [LOCATION] records contain exact
coordinates. The replay output is normalized to PPS fields and deliberately
omits latitude/longitude.
For an already-running board, replay imports the first logged locked
filter/PI snapshot. Starting the model from reset would erase the observed
integrator and create a false acquisition transient. When status is decimated,
commit sequence numbers expand the trace back to the nominal 200 ms cadence;
intermediate values are explicitly marked interpolated=true.
The report separates three quantities that should not be conflated:
- direct
hw_phasestatistics from the board; - fixed-point PI reproduction and a telemetry-conditioned model replay; and
- inferred active phase obtained by integrating
rate_cmdunder a constant oscillator assumption.
Only the first two are directly constrained by firmware/RTL telemetry. The
third is useful for diagnosing slow wander but is not a trusted-generator
measurement. hw_phase itself is a 5 Hz commit residual, not the physical PPS
pin offset. A calibrated, common-clock TIC/scope capture is still required for
a maximum-20 ns output claim.
20 ms diagnosis
The current tracking wrapper shifts the current bit into shift_reg_n, while
its preamble/parity predicate reads the preceding shift_reg_p. On the eighth
following preamble bit, the validator therefore sees only the previous seven
bits. The register contains all eight after the edge, but the bit-valid edge
condition has ended. Validation occurs on the ninth bit, 20 ms later.
The implemented interface is consequently:
current RTL delivery 9 * 20 ms = 180 ms
production POSTPONE_TOW 9 * 20 ms = 180 ms
signed epoch mismatch 0 ms
former firmware value 8 * 20 ms = 160 ms
former signed mismatch 20 ms
Production firmware now uses POSTPONE_TOW=0.180 as the current-RTL-compatible
correction, consistently in both satellite-state and PPS calculations. It is
180 ms, not 190 ms. If RTL is later changed to validate a candidate window
containing the current eighth bit, firmware must return to 160 ms in the same
coordinated release.
The validation intentionally does not modify production RTL or firmware.
Other regression coverage
The unit tests verify:
- parity-valid LNAV round-trip and rejection after one corrupted data bit;
- 1 kHz prompt-sign to 50 bit/s generation and the registered 1 ms sample lag;
- ninth-bit delivery in current RTL and eighth-bit delivery in the candidate implementation;
- constant signed PPS error over successive physical edges;
- 180 ms firmware compatibility with current RTL;
- invariance to synthetic CPU/APB stalls when capture timestamps are used;
- DUT-versus-trusted output-delay sign; and
- rejection behavior for the firmware-permitted
NAV_SOLVE_TIMER=40case.
The N=40 case divides the GPS week but not a 300-bit subframe. When firmware
refreshes the HOW/sample anchor after six seconds, the timer phase is half a
solve period away from that anchor and the current N * 20 ms snap rejects
otherwise valid solves. Production N=10 divides 300 and is unaffected.
If general timer periods are required, reconstruct elapsed time on the
fundamental 20 ms navigation-bit grid. A narrower compatibility restriction is
to accept only periods for which 300 % N == 0.
Hardware confirmation
Before selecting a production correction:
- Probe
bit_valid, the final preamble bits,preamble_ok, parity result, andload_sigswith ILA. - Count whether delivery is on following bit 8 or 9 in the flashed bitstream.
- Measure DUT and trusted PPS with a common time-interval counter and record the sign. The diagnosis predicts a DUT edge approximately 20 ms late.
- Apply only nanosecond-scale output/cable calibration after the epoch mismatch is removed.