# Timing constraints index The authoritative target timing notes are: - [Genesys 2 timing constraints](../targets/genesys2/docs/timing_constraints.md) - [Efinix timing/build notes](../targets/efinix_ti375_c529/docs/efinity_flow.md) Both implementations constrain the RF clock to 30.547 ns by default and the Ethernet GMII domain to 8.000 ns. Their generated 125 MHz RGMII transmit clock phase and board-specific I/O timing are created in the corresponding target clock/periphery implementation. Only known asynchronous relationships and synchronizer/Gray-pointer CDC paths are treated as asynchronous. The design does not apply a broad false path from RF capture to Ethernet logic; the handwritten asynchronous FIFO is the explicit boundary. Unknown MAX2771 external input delays remain documented measurement requirements rather than invented constraints. Clean builds checked on 1 August 2026 reported: | Target | Setup slack | Hold slack | CDC | |---|---:|---:|---| | Genesys 2, Vivado 2026.1 | +0.212 ns worst | +0.090 ns worst | no unexpected major warning accepted by build script | | Ti375 C529, Efinity 2026.1 | +0.636 ns Ethernet, +25.614 ns RF | +0.094 ns Ethernet, +0.031 ns RF | no synchronizer warnings |