Commit Graph

  • 1218c33aa4 Add the fabrication spec and document the RF constraints a reviewer flagged routing-8layer-restack onur 2026-09-01 18:19:22 +03:00
  • 791ca5c9fa Restack the generator and source board to eight layers, matching the deliverable onur 2026-09-01 13:26:37 +03:00
  • 4fa38e35bd Fix the RF launch: relieve the planes under J2 and put the ESD on the line onur 2026-09-01 12:55:49 +03:00
  • 1ea2bc64ac Add the missing TPS2121 status pull-up (R108) and correct the power-mux docs onur 2026-09-01 12:28:00 +03:00
  • 95609a6b6a Complete the routing: 0 DRC violations, 0 unconnected onur 2026-09-01 11:58:41 +03:00
  • af7c43b2a8 Restack to four signal layers and route the board onur 2026-08-16 01:41:43 +03:00
  • b706197667 Initial Ti375 GNSS IMU board design and documentation main onur 2026-08-15 18:09:17 +03:00