25 lines
1.2 KiB
Markdown
25 lines
1.2 KiB
Markdown
# Timing constraints index
|
|
|
|
The authoritative target timing notes are:
|
|
|
|
- [Genesys 2 timing constraints](../targets/genesys2/docs/timing_constraints.md)
|
|
- [Efinix timing/build notes](../targets/efinix_ti375_c529/docs/efinity_flow.md)
|
|
|
|
Both implementations constrain the RF clock to 30.547 ns by default and the
|
|
Ethernet GMII domain to 8.000 ns. Their generated 125 MHz RGMII transmit clock
|
|
phase and board-specific I/O timing are created in the corresponding target
|
|
clock/periphery implementation.
|
|
|
|
Only known asynchronous relationships and synchronizer/Gray-pointer CDC paths
|
|
are treated as asynchronous. The design does not apply a broad false path from
|
|
RF capture to Ethernet logic; the handwritten asynchronous FIFO is the explicit
|
|
boundary. Unknown MAX2771 external input delays remain documented measurement
|
|
requirements rather than invented constraints.
|
|
|
|
Clean builds checked on 1 August 2026 reported:
|
|
|
|
| Target | Setup slack | Hold slack | CDC |
|
|
|---|---:|---:|---|
|
|
| Genesys 2, Vivado 2026.1 | +0.212 ns worst | +0.090 ns worst | no unexpected major warning accepted by build script |
|
|
| Ti375 C529, Efinity 2026.1 | +0.636 ns Ethernet, +25.614 ns RF | +0.094 ns Ethernet, +0.031 ns RF | no synchronizer warnings |
|